Location | Érd alsó, Tárnok, Tétényliget, Kastélypark, Budafok, Albertfalva, etc.
Planning | 2006
Implementation | 2006-2007
Lead architect: Hajnal Zsolt
Architects: Kendelényi Péter, Szüle Péter
The mission was to design a long-lasting roof structure made of high-quality materials. The materials that we applied are hot-dip galvanised and painted steel structures, Alucobond cladding, stainless steel vertical drain pipes and small concrete floor tiles of different colours.